Skip to main content
Ramvio

Built by people who've written, checked and chased RAMS

Ramvio was started by three people from UK construction, in H&S management, site and project delivery, and software, to fix a problem we lived with for years: RAMS that are generic, late and hard to keep track of.

Why we built Ramvio

A RAMS is meant to describe how this job will be done safely, on this site, by these people. In practice it's often written at the last minute, by someone who was never meant to write it.

Not every contractor has a competent person available to prepare their RAMS. When they don't, the job falls to someone else: the principal contractor's H&S team, another contractor on the job, or a consultant brought in at short notice. Or the last site's RAMS gets reworked, sent across and sent straight back.

We've been the ones picking that up. We've written other people's RAMS late into the evening and chased COSHH sheets that never turned up. We've kept spreadsheets of what was approved, what was rejected and what had quietly expired the week before. All the while we were trying to make sure every document would hold up, because if something ever went wrong, that paperwork would matter.

We looked for software to help. What we found was expensive, built for much larger organisations, and didn't fit the way we, or the contractors we worked with, actually worked.

So we built Ramvio. It starts from the real job and the real site, does the drafting, and leaves the decisions with the people responsible for them. It doesn't replace competence on site. It gives competent people their time back.

The team

  • JP FerreiraCo-founder, engineering

    JP spent 18 years in construction and infrastructure, managing projects in Southern Africa and the UK, from power generation to large London residential schemes. He's now a full-stack software engineer, building the tools he wished he'd had on site.

  • Carlos FerreiraHealth and safety manager

    Carlos has more than 17 years in construction. He started out in construction, petrochemical and M&E contracting, and since moving to the UK has worked in M&E and drylining, including eight years in drylining management. With a background in health and safety management, he knows first-hand how much time contractors lose producing and managing RAMS, and he makes sure Ramvio works the way they do.

  • Dewald ViljoenCo-founder, engineering

    Dewald spent 14 years in construction. He started on the tools as an air conditioning and ventilation technician, then ran sites as a site manager and project manager. For the last five years he's been a software engineer, writing software that fits how sites actually work.

How we build Ramvio

  • AI drafts, people approve

    Every RAMS is reviewed and approved by a competent person. Anything Ramvio can't work out is highlighted to confirm, never guessed silently.

  • Specific to the site

    RAMS start from the job, the site and the principal contractor's requirements, and can't be copied to another site.

  • Built for site

    Works on a phone or tablet, and is built to the WCAG 2.2 AA accessibility standard.

  • Your data stays yours

    Your data is stored in London. AI drafting is done by OpenAI and Anthropic under data processing agreements with UK transfer safeguards, and neither uses your data to train its models. A few other providers we use may process data outside the UK under the same safeguards. Our privacy policy has the details.

Where we are now

We're piloting Ramvio with UK contractors and their subcontractors, from December 2026, and launching publicly in February 2027.

Feedback from the pilot shapes what we build next.

Want to help shape Ramvio?

Join early access and tell us what would make RAMS easier for your team.

Register your interest